NEC 250.118(5)
What it means on the job
Flexible metal conduit over 6 feet in length requires an equipment bonding jumper. Even under 6 feet, the FMC connections must provide a reliable ground path, and many jurisdictions require a bonding jumper regardless of length.
Tested in 1 CraftIQ puzzle
- whats-wrongMotor Connection Violations
Related NEC sections
NEC 250.102
Flexible metal conduit in this size/length is not a reliable ground path; an equipment bonding jumper or an EGC must be run to bond the motor.
NEC 250.118 / 250.122 / 406.4(C)
Even though UF cable includes a grounding conductor, if individual conductors are run in conduit underground, an equipment grounding conductor of a recognized type must be included and sized with the circuit so the receptacle has an effective ground-fault current path.
NEC 250.118 / 410.44
Suspended ceiling support wires and grid members are not listed as equipment grounding conductors. A separate equipment grounding conductor or grounding path must be provided for all lighting fixtures.
NEC 250.146(D) / high-rise office Electrical Plans
Data rooms require isolated ground (IG) receptacles to prevent electromagnetic interference from the building's general grounding system from affecting sensitive electronic equipment. The high-rise office plans specifically call out IG receptacles for data room locations.
NEC 250.32(B)
This is correct. In a sub-panel (whether in the same building or a separate structure with a 4-wire feeder), the neutral must be isolated from the equipment grounding conductor and the enclosure. Bonding neutral to ground at a sub-panel creates parallel paths for return current, which can put current on metal parts and create shock hazards. The bonding is done only at the main panel (service equipment).
NEC 250.53(D)(2)
A metal underground water pipe electrode must be supplemented by an additional grounding electrode. It cannot serve as the sole grounding electrode because plastic pipe repairs can interrupt the path.
CraftIQ explanations are original educational commentary written in trade language and verified against the cited standards. Always confirm requirements against the code edition adopted by your jurisdiction — this is training material, not a substitute for the code book or your AHJ.