IPC 605.24
What it means on the job
Dissimilar metals (steel valve body to copper pipe) must be joined with a dielectric fitting to prevent galvanic corrosion.
Tested in 1 CraftIQ puzzle
- whats-wrongChilled Water Isolation Valve Station
Related IPC sections
IPC 604.8 / ASME A112.26
A single PRV with no bypass means the entire residential zone loses water every time the valve is serviced. The IPC doesn't mandate duplex stations — this is a project-specification and high-rise best-practice requirement: two PRVs in parallel with isolation valves so one can be rebuilt while the other carries the zone. Know the difference between what code requires and what the spec you bid requires — both get you red-tagged on this job.
IPC 604.8 / Manufacturer installation requirements
IPC Section 604.8 and manufacturer requirements mandate a strainer upstream of every PRV to prevent debris from fouling the valve seat. Without a strainer, particulate in the water supply causes the PRV to fail — either stuck open (allowing dangerously high pressure downstream) or stuck closed (cutting off water supply to the zone).
IPC 605.11.2
Lead solder is prohibited on any pipe or fitting in a potable water system. Only lead-free solder (0.2% maximum lead content) may be used per the Safe Drinking Water Act and plumbing codes.
IPC 607.3 (thermal expansion control) / project specification
Don't misread the code here. IPC 604.8 only governs WHEN a pressure-reducing valve is required (static pressure over 80 psi) plus its setting/bypass rules — it does NOT mandate a relief valve downstream of each PRV. The actual code requirement is thermal-expansion control on the closed system per IPC 607.3, which is normally satisfied by an expansion tank at the water heater/closed zone, not a relief valve at every PRV. A downstream relief valve at a high-rise PRV station is still good practice / spec: if the PRV fails open, piping and fixtures rated for 80 psi could see 150+ psi. Know what code mandates (expansion control, IPC 607.3) versus what the spec adds (PRV-failure relief).
IPC 607.3.2
When a backflow preventer or check valve is installed on the water service (creating a closed system), a thermal expansion tank is required. Without it, heated water expanding has nowhere to go and can cause dangerous pressure buildup.
IPC 608.1
A garden hose submerged in a pool creates a direct cross-connection. If a back-siphonage event occurs, contaminated pool water can be drawn into the potable supply. Hose bibbs must have vacuum breakers and hoses must never be submerged.
CraftIQ explanations are original educational commentary written in trade language and verified against the cited standards. Always confirm requirements against the code edition adopted by your jurisdiction — this is training material, not a substitute for the code book or your AHJ.