FGI Guidelines 2.2-3.1 / ASHRAE 170
What it means on the job
FGI Guidelines Section 2.2-3.1 and ASHRAE 170 require operating rooms to maintain positive pressure relative to adjacent corridors. Propping the door open defeats the positive pressure relationship, allowing corridor contaminants to enter the sterile field. Studies show each OR door opening increases airborne colony-forming units by 15-30%.
Tested in 1 CraftIQ puzzle
- whats-wrongOR Ventilation Violations
Related OTHER sections
Crestline VFD Specification / NFPA 70
At 15 feet, the cable length is within the 20-foot maximum allowed without engineer approval. Short cable runs minimize reflected wave voltage spikes that can damage motor winding insulation. VFD output pulses travel along the cable and reflect at the motor terminals — longer cables create higher voltage peaks. The proper shielded cable and correct shield grounding at both ends also helps contain electromagnetic interference (EMI). If the run needed to exceed 20 feet, an output reactor or dV/dt filter would be required.
EJMA Standards / ASME B31.1 Section 119
Bellows expansion joints require pipe guides on both sides to ensure axial movement only. Without guides, lateral forces can distort the bellows and cause premature failure.
EJMA Standards / Manufacturer Installation Guide
Shipping restraint bars/rods must be removed after installation and before system operation. Leaving them in prevents the joint from absorbing expansion, transferring all stress to anchors and equipment.
high-rise office Base Building Standard / ASHRAE 90.1 Energy Metering
The high-rise office specification requires a BTU meter on each CRAC unit per base building standard, tied to the building management system (BMS). Without a BTU meter, the tenant cannot be accurately billed for cooling energy consumption, and the base building owner has no visibility into the MDF cooling load for capacity planning.
high-rise office Base Building Standard / ASHRAE 90.1 Section 8 / LEED v4 EAp3
The high-rise office specification explicitly requires BTU meters to be tied to the base building BMS for usage monitoring. Standalone BTU meters with local-only display fail this requirement on multiple fronts: (1) the base building team cannot remotely monitor tenant energy usage for cost allocation; (2) historical trend data is not captured for energy analysis and LEED reporting; (3) there is no remote alarm notification if a meter fails or reads anomalously; (4) LEED v4 prerequisite EAp3 requires building-level energy metering with data accessible from the BMS. The BTU meters have BACnet communication modules — the points must be mapped, trended, and alarmed in the base building BMS to satisfy the specification.
high-rise office Electrical Plans / building alarm integration documents
The project electrical plans require leak detectors in data rooms to be wired to the leak detection panel and integrated with the building alarm/monitoring system. Unconnected leak detectors provide no protection against water intrusion that could destroy data equipment worth hundreds of thousands of dollars. (This is a contract-document/plan requirement, not an NEC-governed item.)