ASHRAE Guideline 12 — Minimizing the Risk of Legionellosis

What it means on the job

Without automatic blowdown control, condenser water cycles of concentration are unmanaged. Manual blowdown is unreliable and either wastes water (over-blowing) or allows mineral concentration to build (under-blowing). An automatic conductivity controller with a motorized blowdown valve is required to maintain proper cycles of concentration (typically 3-6 cycles).

Tested in 1 CraftIQ puzzle

  • whats-wrongCondenser Water Chemical Treatment
Practice this code — free

Related ASHRAE sections

ASHRAE 90.1-2019, Table 6.5.1.1.3

ASHRAE 90.1 Table 6.5.1.1.3 specifies fixed dry-bulb high-limit shutoff temperatures by climate zone. For Climate Zone 4A, the fixed dry-bulb limit is 75 degrees F. This setup correctly locks out the economizer when outdoor air is too warm to provide free cooling. Differential enthalpy is an alternative method.

ASHRAE 90.4 / TIA-942

Branch circuit monitoring is required for capacity planning and to detect load imbalances. ASHRAE 90.4 mandates metering of electrical distribution in data centers, and most Tier III+ designs require per-circuit monitoring.

ASHRAE Fundamentals Handbook — Hydronic System Design

The decoupler pipe should not have isolation valves — this is correct as installed. However, the decoupler pipe connections are spaced only 2 pipe diameters apart. Connections must be spaced at least 6-10 pipe diameters apart to prevent flow turbulence and ensure proper hydraulic separation.

ASHRAE Guideline 13 — Alarm Management

Alarms must be prioritized based on severity. A freeze stat alarm (life-safety) should be higher priority than a dirty filter alarm (maintenance). Without prioritization, critical alarms get lost in nuisance alarms, a condition called 'alarm flooding'.

ASHRAE Guideline 13 — Data Management

Storing trend data only in field controllers risks data loss when controllers are reset or lose power. Trend data should be archived to the BAS server or a dedicated historian. Controller memory is limited and will overwrite oldest data.

ASHRAE Guideline 36 — Chiller Staging

Staging a lag chiller immediately at 100% lead capacity causes hunting and instability. A time delay (typically 10-15 minutes) and sustained load confirmation are required to prevent short-cycling. ASHRAE Guideline 36 specifies staging criteria with time delays and load verification.

CraftIQ explanations are original educational commentary written in trade language and verified against the cited standards. Always confirm requirements against the code edition adopted by your jurisdiction — this is training material, not a substitute for the code book or your AHJ.