← Back🔧 Build-Along

Rough-In a Residential Bathroom

Plumb a complete bathroom group from main stack to fixture stubs. Covers DWV stack and vents, fixture branches and traps, water supply distribution, tub/shower mixing valve rough, pressure testing both water and DWV, and inspection prep. Grounded in IPC Chapters 6 and 7.

IPC 305IPC 605IPC 706IPC 909IPC 1002IPC Table 710.1

0% complete

1

Day 1: Layout and rough opening verification

~4h · 4 tasks · 1 quiz

2

Day 2: DWV — main stack and vent

~8h · 4 tasks · 1 quiz

🔒
3

Day 3: DWV — branch drains and traps

~8h · 4 tasks · 1 quiz

🔒
4

Day 4: Water supply rough-in

~6h · 4 tasks · 1 quiz

🔒
5

Day 5: Tub/shower mixing valve rough-in

~6h · 4 tasks · 1 quiz

🔒
6

Day 6: Pressure test water + DWV

~6h · 4 tasks · 1 quiz

🔒
7

Day 7: Inspection prep and walkthrough

~4h · 4 tasks · 1 quiz

🔒

Loading progress…