Multi-Day Build-Alongs
Structured day-by-day projects that mirror real installs — tasks, code-grounded quizzes, and Bucky tips.
⚡
Wire a 200A Residential Sub-Panel
5 days · ~32h
Plan, mount, feed, and trim out a 200A residential sub-panel from main service to branch circuits.
🔧
Rough-In a Residential Bathroom
7 days · ~44h
DWV, water supply, fixture stubs, and pressure testing — full plumbing rough-in for a single-bathroom group.
🌀
Install a Mini-Split Heat Pump
4 days · ~26h
Plan, mount, line-set, electrical, and commission a single-zone ductless mini-split heat pump system.