🌀

Air Device Takeoff — Locker/Shower Zone

HVAC / Sheet Metal

Difficulty 2Year 3-4130 XP

A real mechanical plan zone. Pick each air-device stamp and tap every supply, return, exhaust, and linear-slot device the engineer drew. The answer key here is human-verified.

Real sheet, verified key. A real mechanical plan zone with a human-checked answer key.
Loading sheet…

Pick a stamp, tap each device. Scroll to zoom, drag to pan. Tap a mark again to remove it.