Play/Pipe Mazes
๐Ÿ”ง

BREAK ROOM

Pipe Mazes

Quick pipe-routing puzzles for breaks. Rotate the dashed cells to connect the source to the right destination.

Lower XP than real puzzles ยท doesn't count toward your weekly league rank.

Y1

1st Year Apprentice

0 XP total โ€ข 500 to next

0 solved
๐ŸŽ›๏ธBuilding Controls
โ˜…

Route the Signal

Connect the temperature sensor to the correct controller input.

5x5 grid20 XP
๐ŸŽ›๏ธBuilding Controls
โ˜…

Connect the Sensor Network

Route the BACnet trunk cable from the controller to the correct network port.

5x5 grid25 XP
๐ŸŽ›๏ธBuilding Controls
โ˜…

Map the BACnet Trunk

Connect the building controller to the IP network backbone.

5x5 grid25 XP
โšกElectrical
โ˜…

Complete the Circuit

Route the power feed from the panel to the correct outlet.

5x5 grid20 XP
โšกElectrical
โ˜…

Route Power to the Panel

Connect the transformer secondary to the distribution panel.

5x5 grid25 XP
โšกElectrical
โ˜…

Find the Ground Path

Route the equipment grounding conductor from the panel to the ground rod.

5x5 grid25 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…

Direct the Airflow

Rotate the duct sections to route supply air from the AHU to the office zone.

5x5 grid25 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…

Route Supply Air to Zone 3

Connect the main trunk duct to the Zone 3 diffuser.

5x5 grid20 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…

Balance the Duct Branch

Route the return air from the office back to the AHU.

5x5 grid25 XP
๐Ÿ”ฉPipefitting
โ˜…

Connect the Steam Header

Route the steam line from the boiler to the correct distribution header.

5x5 grid25 XP
๐Ÿ”ฉPipefitting
โ˜…

Route the Chilled Water

Connect the chiller supply to the correct AHU coil.

5x5 grid20 XP
๐Ÿ”งPlumbing
โ˜…

Route the Water Supply

Rotate the pipe sections to connect the water main to the correct fixture.

5x5 grid25 XP
๐Ÿ”งPlumbing
โ˜…

Find the Drain Path

Connect the floor drain to the correct waste line outlet.

5x5 grid20 XP
๐ŸŽ›๏ธBuilding Controls
โ˜…โ˜…

VAV Box Control Loop

Route the control signal from the zone sensor through the DDC controller to the VAV damper actuator.

7x7 grid45 XP
๐ŸŽ›๏ธBuilding Controls
โ˜…โ˜…

Chiller Plant Sequencing

Route the lead/lag signal from the BAS server to the correct chiller controller.

7x7 grid40 XP
โšกElectrical
โ˜…โ˜…

Emergency Generator Feed

Route the emergency power from the generator through the ATS to the emergency panel.

7x7 grid45 XP
โšกElectrical
โ˜…โ˜…

Fire Alarm Circuit Route

Route the fire alarm initiating device circuit from the FACP to the smoke detector.

7x7 grid40 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…โ˜…

Exhaust Duct Routing

Route kitchen exhaust through the grease duct to the correct termination.

7x7 grid45 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…โ˜…

Smoke Control Duct Path

Route the smoke control damper activation path from the fire panel.

7x7 grid45 XP
๐Ÿ”ฉPipefitting
โ˜…โ˜…

Complete the Glycol Loop

Route the glycol solution from the heat exchanger to the correct outdoor coil.

7x7 grid40 XP
๐Ÿ”ฉPipefitting
โ˜…โ˜…

Condensate Recovery Path

Route the steam trap discharge to the correct collection point.

7x7 grid45 XP
๐Ÿ”งPlumbing
โ˜…โ˜…

Connect the Hot Water Loop

Route the hot water recirculation line from the heater to the return.

7x7 grid40 XP
๐Ÿ”งPlumbing
โ˜…โ˜…

Route the Vent Stack

Connect the fixture trap to the proper vent termination through the wall.

7x7 grid40 XP
๐ŸŽ›๏ธBuilding Controls
โ˜…โ˜…โ˜…

Integrated Fire/HVAC Shutdown

Route the fire alarm relay signal to shut down the correct AHU through the BAS interlock.

9x9 grid70 XP
โšกElectrical
โ˜…โ˜…โ˜…

Data Center UPS Feed

Route critical power from the UPS through the PDU to the server rack.

9x9 grid65 XP
๐ŸŒ€HVAC / Sheet Metal
โ˜…โ˜…โ˜…

VRF Refrigerant Piping Layout

Route the VRF refrigerant line from the outdoor unit to the correct indoor unit through the branch controller.

9x9 grid60 XP
๐Ÿ”ฉPipefitting
โ˜…โ˜…โ˜…

Cooling Tower Piping

Route the condenser water from the chiller to the cooling tower through the correct path.

9x9 grid60 XP
๐Ÿ”ฉPipefitting
โ˜…โ˜…โ˜…

Process Steam Distribution

Route high-pressure steam from the main header through the PRV station to the correct process load.

9x9 grid70 XP
๐Ÿ”งPlumbing
โ˜…โ˜…โ˜…

Underground Piping Network

Route the main sewer lateral from the building to the correct connection point.

9x9 grid65 XP
๐Ÿ”งPlumbing
โ˜…โ˜…โ˜…

Medical Gas Distribution

Route the oxygen supply from the manifold to the correct patient zone.

9x9 grid70 XP