NEC 590.6(A) / high-rise office Specification

What it means on the job

This temporary power installation is code-compliant. NEC 590.6(A) requires GFCI protection for all 125V, 15A and 20A receptacle outlets used for temporary power during construction. The high-rise office specification additionally requires clear labeling of all temporary panels and breakers. Properly labeled temporary power ensures systematic removal at project completion and prevents confusion with permanent circuits during final inspection. The contractor must remove all temporary stringers, lamps, outlets, breakers, and fusing at completion per high-rise office specifications.

Tested in 1 CraftIQ puzzle

  • code-checkhigh-rise office Office TI: Temporary Power GFCI Protection
Practice this code — free

Related NEC sections

NEC 517.31(B) / NFPA 99 Section 6.4.1.1.4

NEC 517.31(B) and NFPA 99 Section 6.4.1.1.4 require the life safety branch of the essential electrical system to restore power within 10 seconds of utility failure. A 15-second transfer time means exit lighting, fire alarm systems, and critical corridor illumination remain dark for 5 seconds beyond the allowable limit — an eternity during a hospital evacuation.

NEC 517.33 / NEC 517.34

This fails code. NEC 517.33 and 517.34 specifically require nurse call systems, task illumination in patient care areas, and selected receptacles at patient bed locations to be connected to the critical branch of the essential electrical system. These loads are not optional — they must be on the critical branch regardless of generator capacity concerns. During a utility outage, patients on monitors and ventilators need powered receptacles, nurses need call system notification, and clinical staff need task lighting. If the generator cannot handle the full essential system load, the generator must be upgraded — not the load assignments reduced.

NEC 590.4(D) / high-rise office Specification

The high-rise commercial office specification requires all panels and breakers used for temporary lighting to be clearly labeled. Unlabeled temporary power creates confusion about which circuits are temporary vs. permanent and risks leaving construction power live during turnover.

NEC 620.37 / IMC 602.2

NEC 620.37 and IMC 602.2 prohibit using elevator machine rooms as supply, return, or exhaust air plenums for other building spaces. Ductwork from adjacent spaces introduces contaminants, fire risk, and smoke migration paths into the machine room. The machine room must have its own dedicated ventilation system.

NEC 645.10

This installation meets NEC 645.10 requirements. The disconnecting means must be located at the principal exit door(s) and within sight of the IT equipment. It must be capable of disconnecting power to all electronic equipment and the dedicated HVAC system serving the room. The protective cover is a best practice that prevents accidental activation, which is one of the most common causes of unplanned data center outages. The installation as described satisfies all code requirements for the disconnecting means.

NEC 645.5 / NEC 300.22

This fails code. When the space under a raised floor is used as an air-handling plenum — which is the standard cooling configuration in data centers — NEC 300.22 and NEC 645.5 restrict the types of wiring methods permitted. Standard NM-B cable is not rated for plenum use because its PVC jacket produces toxic smoke and fumes when exposed to fire. Only plenum-rated cables (such as Type DP), wiring enclosed in metal conduit, or other listed wiring methods specifically approved for plenum spaces are permitted. This requirement exists because toxic smoke spread through the air distribution plenum could rapidly contaminate the entire data center and endanger personnel.

CraftIQ explanations are original educational commentary written in trade language and verified against the cited standards. Always confirm requirements against the code edition adopted by your jurisdiction — this is training material, not a substitute for the code book or your AHJ.